CBO估计执行计划需要参考的三项

时间:2015-05-06 15:05:13   收藏:0   阅读:176

Estimator

The estimator determines the overall cost of a given execution plan. The estimator generates three different types of measures to achieve this goal:

If statistics are available, then the estimator uses them to compute the measures. The statistics improve the degree of accuracy of the measures.


最重要的就是上面三个方面:

1.选择度

2.基数

3.成本

原文:http://blog.csdn.net/lemontree1123/article/details/45535463

评论(0
© 2014 bubuko.com 版权所有 - 联系我们:wmxa8@hotmail.com
打开技术之扣,分享程序人生!